Quantcast
Channel: Telangana NavaNirmana Sena
Viewing all articles
Browse latest Browse all 1751

4 Lane Greenfield Expressway from Girmapur to Reddipalle village in Telangana

$
0
0

The National Highways Authority of India (NHAI) has announced a request for proposal (RFP) for the development of a 4-lane access-controlled greenfield regional expressway on the northern side of Hyderabad. This ambitious project will span from Girmapur village to Reddipalle village, covering a total distance of 34.518 km in Telangana.

RRR Map for 4 Lane Greenfield Expressway from Girmapur to Reddipalle village in Telangana

https://www.google.com/maps/d/u/0/edit?mid=1H8koPoFU3d8x1EoZaxwEOydQJpn2ptc&usp=sharing

4 Lane Greenfield Expressway Project Overview

As part of its mission to enhance national highway infrastructure, the Ministry of Road Transport & Highways, through NHAI, will undertake the expressway’s development under the Engineering, Procurement, and Construction (EPC) mode. This project forms Package-I of the broader initiative to boost regional connectivity and ease traffic congestion around Hyderabad.

Key Project Details

  • Project Scope: Development of 4-lane access-controlled expressway
  • Location: Girmapur to Reddipalle, Telangana
  • Design Length: 34.518 km
  • Estimated Cost: ₹1529.19 Crores (inclusive of utility shifting)
  • Completion Period: 2 years
  • Maintenance Period: 5 years

Bidding Process and Timeline

NHAI, represented by its Chairman, invites bids from qualified contractors for the project. Interested parties can access and download the complete bid document from official portals:

The bid documents will be available from December 27, 2024, to February 14, 2025, up to 11:00 AM IST. Contractors must submit their financial and technical bids online by the closing date. Online bids will be opened on February 17, 2025, at 11:30 AM IST.

Important Note:
Physical submission of bid security, power of attorney (POA) for signing, JV documents (if applicable), integrity pact, and experience certificates will be required from the lowest bidder before issuing the Letter of Acceptance (LOA).

Submission Guidelines

  • Mode of Submission: Online only at http://etenders.gov.in and https://bims.gov.in
  • Deadline for Physical Documents: Within 5 working days post bid due date (by 11:00 AM)
  • Accepted Payment Instruments:
    • Account Payee Demand Draft
    • Fixed Deposit Receipt
    • Banker’s Cheque

NHAI reserves the right to accept or reject any or all bids without providing justification.

Contact Information

For further details or inquiries, bidders can reach out to:
Shri Prashant N. Gawasane
General Manager (Tech) – Telangana
National Highways Authority of India
G-5&6, Sector-10, Dwarka, New Delhi-110075
Phone/Fax: +91-11-25074100/200 (Extn. 3130)
Email: prashant@nhai.org

Why This Project Matters

The development of this expressway is set to transform regional connectivity, reduce travel time, and enhance economic growth in Telangana. By facilitating smoother traffic flow around Hyderabad, the expressway aims to support infrastructure growth and open new avenues for trade and logistics.

For contractors eager to participate in nation-building, this project presents a lucrative opportunity to contribute to one of India’s most important infrastructure initiatives.


Viewing all articles
Browse latest Browse all 1751

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>